News

HSC LEONORA CHRISTINA

Bornholmerfærgens LEONORA CHRISTINA was in the dry dock for maintenance docking, repair and painting in end of February. All waterjets taken out for maintenance.
All Main Engines went through their 16 000 h overhaul carried out by MAN and with yard assistance, and we also performed work such as Swap position of MOB boats and repair of seawater pipes. She left the yard March 22nd.